Improved OTD, Cost Reduction, and Impact on Sales

Sector : Road shoulder

Solution : Smoothing flows, managing deliveries, optimizing OTD, reducing costs

The challenge

Noremat was experiencing difficulties due to our OTD inefficiency, which disrupted their production and resulted in additional costs. This affected their sales and reputation because they could not meet customer demand on time.

Our solution

Results obtained

Conclusion

Improving our OTD and smoothing out flows has not only enabled Noremat to optimize its processes and reduce costs, but has also had a positive impact on our sales. Thanks to improved responsiveness and close collaboration, we have contributed to the growth of both companies.

Plastics processing
Manufacture of a 50-meter-long turnkey walkway for the plastics industry: mobilization of several areas of expertise Hexalean
Feasibility study, co-design and 3D CAD, mobilization of Hexalean's expertise (metal fabrication, long-length welding, laser cutting, machining, painting, and finishing), controlled logistics, ten-year warranty
Learn more
Réintégration de la Production d’un Composant Mécano-Soudé pour Volvo
Construction equipment
Reintegration of the Production of a Mechanically Welded Component for Volvo
Production reintegration, robotic islands, specific quality system, Just-in-Time (JIT) delivery
Learn more
Production urgente en grande quantité de pièces en inox complexes
Street furniture
Urgent production of large quantities of complex stainless steel parts for a prestigious construction project
Laser welding, investment in a dedicated unit, specific templates, accelerated training for teams
Learn more